The Budhi Gandaki River at the KHA dam site, Gorkha, Nepal

Independent hydropower · China & Nepal · Since 2003

Steady power from mountain rivers.

We develop, build and operate small and mid-sized hydropower plants for the long term.

Budhi Gandaki River · KHA dam site, Gorkha · 28.2°N 84.6°E

Years in hydropower
20+
Invested and built across 20+ plants, including some since soldInvested and built
700MW+
In operation · 11 controlled plantsIn operation
360.8MW
In development · Nepal hydropowerIn development
329.4MW

Since 2003 we have invested in, built and run hydropower plants across Yunnan, Sichuan, Xinjiang and Hunan. Our next projects are in Nepal.

Based in Yunnan, Meiya Minrui Power is an independent owner-operator focused on small and mid-sized run-of-river and reservoir plants. We carry projects from origination and financing through construction, commissioning and decades of operation.

We built or rebuilt four of our current plants, 145.5 MW in total. Our own teams run all eleven plants we control.

Our story

Operating in China. Developing in Nepal.

80°E85°E90°E95°E100°E105°E110°E115°E45°N40°N35°N30°N25°NALTAY, XINJIANG100.0 MW operatingNUJIANG & DIQING, YUNNAN155.8 MW operatingLIANGSHAN, SICHUAN36.0 MW operatingZHUZHOU, HUNAN69.0 MW operatingNEPAL329.4 MW in development · hydro
Schematic · positions by coordinates · marker size proportional to capacity
Operating plants
PlantLocationMWCOD
4 further plantsYunnan & Sichuan24.6
Total in operation360.8
View all projects
  • Yunnan155.8 MW
  • Xinjiang100.0 MW
  • Hunan69.0 MW
  • Sichuan36.0 MW
  • Nepal · in development329.4 MW

329.4 MW on the Budhi Gandaki, with PPAs signed before construction.

Two cascade projects in Gorkha District, both with take-or-pay power purchase agreements. By design, more than 30% of their output comes in the dry season.

  • Budhi Gandaki KHA

    226MW

    Annual generation
    1,264 GWh
    Units
    3 × 75.3 MW
    Rated head
    195 m
    Utilization
    5,592 h
  • Budhi Gandaki KA

    103.4MW

    Annual generation
    564 GWh
    Units
    2 × 51.7 MW
    Rated head
    89 m
    Utilization
    5,454 h

Clean energy, responsibly run.

Our approach to sustainability
  • Tangmanhe II powerhouse, penstock and switchyard on a steep valley side
    Tangmanhe II · Shangri-La, Yunnan · National Green Small Hydropower demonstration plant

    Green Small Hydropower

    Tangmanhe II is a national Green Small Hydropower demonstration plant.

  • Generator floor at the Dongguaping hydropower station, Yunnan
    Generator floor · Dongguaping

    Operational safety

    Grade II certification under China’s national Work Safety Standardization system.

  • The Taoshui reservoir and intake tower in mist
    Taoshui · Hunan

    Flood control and irrigation

    Taoshui’s multi-year reservoir also provides flood control, irrigation and aquaculture for the region.