Kesaiyi
Hydropower Station

  • Operating
  • Xinjiang
  • Reservoir · seasonal regulation
Installed capacity
100MW
Average annual generation
332GWh
Annual utilization
3,322h
Dam height
108m
Total reservoir storage
95million m³

Our largest plant, fed by Altai snowmelt and regulated by a seasonal reservoir.

Kesaiyi joined our fleet in December 2024. Within eight months, the team repaired seepage paths in the dam and headrace tunnel, passed the periodic dam safety inspection by the National Energy Administration's dam safety center, raised the operating level and increased annual generation by about 20%.

Status
In operation since December 2017
Plant history
COD Dec 2017 · In our fleet since 2024
Location
Altay Prefecture, Xinjiang
Operating company
Xinjiang Altay Huaning Hydropower Investment & Development Co., Ltd.
Water source
Predominantly snowmelt
Regulation
Seasonal
Units
2 × 50 MW vertical Francis
Dam
108 m high
Total / active storage
95.0 / 38.72 million m³
Average annual generation
332 GWh
Annual utilization
3,322 hours